The FPSO will be deployed at the Sangomar (formerly SNE) field located approximately 100 km south of Dakar, Senegal. The Sangomar Field Development is expected to be Senegal's first offshore oil development.

MODEC was awarded a Front End Engineering Design (FEED) contract of the FPSO in February 2019 and has now been awarded the FPSO purchase contract further to Final Investment Decision (FID) on the Sangomar Field Development which was made in January 2020.

The FPSO vessel will be permanently moored at a water depth of approximately 780 m by an External Turret mooring system to be supplied by SOFEC, Inc., a MODEC group company.

The FPSO will be capable of processing 100,000 barrels of crude oil per day, 130 million standard cubic feet of gas per day, 145,000 barrels of water injection per day and will have minimum storage capacity of 1,300,000 barrels of crude oil.

Unit Name
FPSO Léopold Sédar Senghor
Field
Sangomar field
Country
Senegal
Hull
Conversion
Water Depth
780 m
Mooring Type
SOFEC External Turret
Storage Capacity
1,300,000 bbls
Oil Production
100,000 bopd
Gas Production
130 mmscfd
Produced water re-injection
145,000 bwpd
Client
Woodside Energy
Contract
Purchase Contract and Operation & Maintenance Contract
Scope of Work
FPSO Construction and Operation & Maintenance
First Oil
2024
O&M Period
10 years + 10 one-year extension options
Current Status