FPSO MV8 Langsa Venture
The FPSO MV8 Langsa Venture was converted by MODEC under a fast-track schedule for installation on the Langsa field offshore North Sumatra, Malacca Strait, Indonesia.
The project was successfully undertaken in only 8 months up to first oil.
Scope of Work
- Engineering
- Procurement
- Construction
- Installation
- Commissioning
- Operation and Maintenance
| Unit Name |
FPSO MV8 Langsa Venture |
| Contract |
EPCI + Time Charter |
| First Oil |
November 2001 (Oil production suspended from October 2002 to November 2004) |
| Charter Re-Start |
November 2004 |
| Client |
MEDCO MOECO Langsa Ltd. |
| Status |
In Operation (MODEC owns and operates) |
| Field Name |
Langsa Field |
| Country |
Indonesia |
| Water Depth |
100 m (328 ft) |
| New/Conv |
Conversion |
| Mooring Type |
SOFEC Spread Mooring |
| Storage Capacity |
270,000 bbls |
| Oil Production |
15,000 bopd |
| Water Production |
10,500 bwpd |