HOME > Floating Production Solutions > FPSO/FSO > MODEC FPSO/FSO Projects > FPSO Song Doc Pride MV19


FPSO Song Doc Pride MV19

The Song Doc field is located in Block 46/02, approximately 170 kilometers offshore Vietnam.

The FPSO will be capable of processing 30,000 barrels of liquid per day and will have an oil storage capacity of 360,000 barrels. The FPSO is planned to be installed in 55 meters water depth.

MODEC will convert a Panamax tanker. The FPSO is expected to start the production in the field in mid 2008. The charter contract of the FPSO is five years with an additional five one-year options.

Scope of Work

  • Engineering
  • Procurement
  • Construction
  • Installation
  • Commissioning
  • Operation and Maintenance

Unit Name FPSO Song Doc Pride MV19
Contract EPCI + Time Charter
First Oil Planned mid 2008
Charter Period 5 years + five 1-year options
Client Truong Son Joint Operating Company (TSJOC)
Status Under Construction (MODEC owns and will operate)
Field Name Song Doc Field
Country Vietnam
Water Depth 55m
New/Conv Conversion
Mooring Type SOFEC Spread Mooring
Storage Capacity 360,000 bbls
Oil Production 30,000 bopd