FPSO Errea Wittu

  • FPSO
  • New-build
  • 1,690m
  • Spread Mooring
  • EPCI
  • O&M
FPSO Errea Wittu

The Uaru FPSO is named "Errea Wittu", which means "abundance", and is the fifth offshore FPSO in Guyana.

The FPSO is built on MODEC’s proprietary hull design, with a full double hull and an enlarged topsides deck area to accommodate high-capacity processing systems. It is also equipped with a Gas Turbine Combined Cycle system, designed to improve energy efficiency and reduce CO2 emissions. These design features enable reliable and efficient operations over the life of the asset. ​

MODEC embedded cutting edge digital technology into the FPSO. It is designed for remote operations from shore and its onboard operations run on Shape Digital’s AI suite1, which draws on a wealth of fleet-wide data from large scale operations across the world. Shape Digital uses more than 200 AI models to flag potential equipment failures in advance, while optimizing energy use in real time to reduce emissions. Together, these technologies deliver smarter, safer, more efficient and sustainable operations. ​

Unit Name
FPSO Errea Wittu
Field
Snoek, Mako and Uaru resources in the Stabroek block
Country
Guyana
Hull
New-build
Water Depth
1,690 m
Mooring Type
SOFEC Spread Mooring
Storage Capacity
2,000,000 bbls
Oil Production
250,000 bopd
Gas Production
540 mmscfd
Produced water re-injection
350,000 bwpd
Client
ExxonMobil Guyana
Contract
EPCI + O&M
Scope of Work
Engineering, Procurement, Construction and Installation (EPCI) and Operation & Maintenance (O&M)
Delivery to Client
2026
First Oil
November 2026
O&M Period
10 years
Current Status
In Operation (MODEC operates)

Other Projects in South America

View the full list of our projects