FPSO Errea Wittu
- FPSO
- New-build
- 1,690m
- Spread Mooring
- EPCI
- O&M


The Uaru FPSO is named "Errea Wittu", which means "abundance", and is the fifth offshore FPSO in Guyana.
The FPSO is built on MODEC’s proprietary hull design, with a full double hull and an enlarged topsides deck area to accommodate high-capacity processing systems. It is also equipped with a Gas Turbine Combined Cycle system, designed to improve energy efficiency and reduce CO2 emissions. These design features enable reliable and efficient operations over the life of the asset.
MODEC embedded cutting edge digital technology into the FPSO. It is designed for remote operations from shore and its onboard operations run on Shape Digital’s AI suite1, which draws on a wealth of fleet-wide data from large scale operations across the world. Shape Digital uses more than 200 AI models to flag potential equipment failures in advance, while optimizing energy use in real time to reduce emissions. Together, these technologies deliver smarter, safer, more efficient and sustainable operations.
- Unit Name
- FPSO Errea Wittu
- Field
- Snoek, Mako and Uaru resources in the Stabroek block
- Country
- Guyana
- Hull
- New-build
- Water Depth
- 1,690 m
- Mooring Type
- SOFEC Spread Mooring
- Storage Capacity
- 2,000,000 bbls
- Oil Production
- 250,000 bopd
- Gas Production
- 540 mmscfd
- Produced water re-injection
- 350,000 bwpd
- Client
- ExxonMobil Guyana
- Contract
- EPCI + O&M
- Scope of Work
- Engineering, Procurement, Construction and Installation (EPCI) and Operation & Maintenance (O&M)
- Delivery to Client
- 2026
- First Oil
- November 2026
- O&M Period
- 10 years
- Current Status
- In Operation (MODEC operates)