Shenzi TLP

  • TLP
  • New-build
  • 1,333 m
  • EPC
Shenzi TLP

The Shenzi field comprises Green Canyon Blocks 609, 610, 653 and 654 in the Gulf of Mexico and is approximately 120 mi. from the Louisiana Coast.

The Shenzi TLP is the fifth and largest MOSES design TLP to date, with a payload capacity of 15,500st and displacement of 43,500st.

The TLP has up to 20 subsea production and water injection wells tied back to the facility and is capable of processing 100,000 barrels of oil and 50 million cubic feet of gas per day.

The TLP was installed in 1,333 m water depth in July 2008.

Unit Name
Shenzi TLP
Field
Shenzifield、Green Canyon Block 653
Country
USA - Gulf of Mexico
New/Conversion
New-build
Water Depth
1,333 m (4,300 ft)
Oil Production
100,000 bopd
Gas Production
100 mmscfd
Produced water re-injection
125,000 bwpd
Client
BHP Billiton Petroleum (Americas) Inc.
Contract
EPC + pre-commissioning
Scope of Work
Engineering, Procurement, Construction, Pre-commissioning
First Oil
March 2009
Current Status
Delivered